A Four Week Snap Shot

I can't believe it has been a month since our last blog post, this year is passing by so quickly. It is a race towards the finish line now with various deadlines needing to be met !

Much progress has been made in the last four weeks, the roof is entirely laid now with only the guttering to be fitted, the re-wiring and insulation completed and the arrival of the gibstoppers this week means the walls are being prepared for painting.  The upstairs windows are in and the skylights have all been fitted and a temporary staircase has been made to ensure safe and easy access to the upstairs floor.

The coming weeks will see the old timber floor being fixed up in places with original boards and the new part of the house having a new timber floor laid. 