After many months of poring over plans and elevations the second storey has now taken shape and has become a reality. The framing is up and the external roof lining has been installed. Finally we are able to feel this space. The only drawback is it not being able to see the view, we can only visualise this from photos we took from the roof before the building started.



The external deck was in the beginning stages of being started and the tiles at the front door where removed only to reveal another layer of lino tiles laid ontop of the original timber floors. Our ensuite tiles arrived today and I can't wait to see these when the time comes - all be it quite a few months away !


The re-pilers should be finished this week and the house feels so much straighter, what soil they have removed from underneath the house has nearly filled in the pool.